Neg. No. N18-03-05: Supply and Delivery of Various Construction Materials to be used in the construction of Grain Processing Shed for 15 FSTP Farmers Association of the Province of Cebu

Cebu Provincial Government logo

Republic of the Philippines
PROVINCE OF CEBU
BIDS AND AWARDS COMMITTEE
Cebu Capitol, Cebu City

INVITATION TO ENGAGE IN NEGOTIATION AND REQUEST FOR SUBMISSION OF PRICE QUOTATION

 

 

For the procurement of One (1) Lot VARIOUS CONSTRUCTION MATERIALS.

 

In view of two (2) failed biddings, the Province of Cebu thru its Bids and Awards Committee (BAC)invites interested bidders for  a Negotiation and to submit bids/quotations for the hereunder requirements, viz:

 

Neg. Control Number No. Qty unit Item Description ABC (Php) Purpose
N18-03-05   (ref: Adv. No. 17-102) 1

 

1

 

LOT

 

Various Construction Materials:

*Materials per site*

3,747,812.50

 

 

 

To be used in the Construction of Grain Processing Shed for 15 FSTP Farmers Association of the Province of Cebu.

 

    141

11

16

140

37

15

0.4

575

45

45

3

1.5

28

23

18

8

0.5

108

12

12

12

2,000

5

19

12

1

1

1

1.5

2

2

3

1.5

2

1

1

2

3

1

1

1

1

1

8

Bags

Cu.m.

Cu.m.

Pcs

Pcs

Pcs

Rolls

Pcs

Pcs

Pcs

Kg

Kg

Pcs

Pcs

Pcs

Pcs

Bxs

Pcs

Pcs

Pcs

Pcs

Pcs

Cans

Pcs

Pcs

set

set

kg

gal

pcs

pcs

gal

gal

pcs

pc

pc

pcs

pcs

pc

pc

pc

pc

roll

pcs

 

1.  Portland Cement (40 kg/bag)

2.  Sand

3.  Gravel

4.  10mm Deformed Bar

5.  12mmm Deformed Bar

6.  Tie Wire #16 (29-30kg/roll)

7.  4” CHB

8.  Reflectorized Traffic paint, white

9.  2” x 3” x 10” Coco lumber

10.2” x 2” x 10’ Coco lumber

11.4” CWN

12.1” CWN

13.1/4 Thick, 1 ½”, 1 ½ Angle Bars (6mm)

14.1/4 Thick, 1 ”, 1” Angle Bars (5mm)

15.1.5mm thick, 2”x3” C-purlin

16.10mm dia.m. def. bars sag rod (plain bar)

17. Welding Rod (20kg/box)

18.8’ GA 24 Corr. GI Sheet

19. 24” x 8’ cut pre-painted S-type Gutter (yellow)

20. Pre-painted ridge roll (yellow)

21. 5mm thick fiber cement board (hardiflex)

22. Teck screw (2”)

23. Vulcaseal (1/4 can)

24. 2” Dia. GI Pipe (S20)

25. 2” Interlink wire (H-3ft) (4” x 3’)

26. 0.6 x 2.1 m PVC door w/jamb

27. 0.5 x 0.5m window (jealous set)

28. 3” concrete nails

29. Red Lead primer oxide

30. 2” paint brush

31. 4” paint brush

32. Gloss latex paint (double coating)

33. Acrylic roof shield paint (roofguard B-guard)

34. 4” PVC Pipe, S-1000

35. ½ dia. Blue pipe (water)

36. 4” x 2” Tee reducer

37. 4” dia. 90 deg. Elbow

38. ½ dia. 90 deg. Elbow

39. 4” floor drain

40. Toilet Bowl (ordinary)

41. Faucet (PVC Faucet)

42. PVC Solvent (400 CC)

43. Teflon (3/4)

44. 4” Pinlight, w/18 watts (set)

 

 

 

 

 

/2018/notice/np18-03-05/p2

 

 

Neg. Control Number No. Qty unit Item Description ABC (Php) Purpose
    1

1

1

5

5

10

25

1

35

4

5

8

6

pc

pc

pc

pcs

mtrs

mtrs

mtrs

pc

mtrs

rolls

pcs

pcs

pcs

45. 15 A Circuit breaker w/ housing

46. 20 A Circuit breaker w/ housing

47. 30 A Circuit breaker w/ housing

48. Three gang C.O. (Surface)

49. No. 10 PDX Wire

50. No. 12 PDX Wire

51. No. 14 PDX Wire

52. ½ “ PVC Pipe (Electrical)

53. ½ “ Flexible hose (Electrical – orange)

54. Electrical tape

55. Junction box w/cover

56. Utility Box

57. ¼ Thick Ordinary plywood

 

   
 
 

 

 

        LOT BID PRICE / SITE    
        LOT BID PRICE for the 15 SITES    

 

 

The Simultaneous Negotiation will be conducted on March 19, 2018, Monday, 2:00 P.M., at the BAC Conference Room, Ground Floor, Capitol Building, Cebu City.  The complete technical specification, guidelines, documents, and other information relative thereto will be the subject of discussion.

 

Thereafter, the Province of Cebu through its Bids and Awards Committee will distribute the Request for Quotation (RFQ) to prospective bidders.

 

The Submission and Opening of Best and Final offers will be held on MARCH 23, 2018, FRIDAY, 10:00 A.M.,  BAC Conference Room, Ground Floor, Capitol Building, Cebu City.

 

The bidder with the Lowest Calculated Bid (LCB) or Single Calculated Bid (SCB) shall be required to submit the additional documents stated in the Checklist of Additional Requirements.

 

Very truly yours,

 

ATTY. MARK C. TOLENTINO

BAC Chairman