PR NO. 19-03-1138 (2 units 2.0HP Aircon. For use in Naga Farm Facility & New Office Extension -LN2 Plant Facility (PVO).

Republic of the Philippines
Province of Cebu
BIDS and AWARDS COMMITTEE
Cebu Capitol, Cebu City
MODE OF PROCUREMENT : NEGOTIATED 53.9
Control No. 19-0837 Dated : March 8, 2019
Note: Please state the fullname of the establishment P. R. No. 19-03-1138 Dated : March 7, 2019
        as appearing in the OFFICIAL RECEIPTS. O.R. No. 100-19-02-3062 Dated :
ABC: P102,000.00
Gentlemen:
            Please quote your prices on the following listed articles which the Province of Cebu desires  to  buy  if
to the government. For clarification & inquiry call Telefax Nos. 253-7160 or 888-2328 local 1228 – 1229 or email us
at bacgscapitol@gmail.com.
♥ Prices quoted should be VAT inclusive and subject to withholding tax.
♥ PhilGEPS Registration Number: ______________________
♥ Terms of payment: _________________________
♥ Delivery Date: 30CD     BIDS and AWARDS COMMITTEE
♥ Deadline of quotation: _______________________
♥ TIN No.: ______________________________________________________________ (Sgd)
♥ Place of Delivery: @ Naga Farm Facility & LN2 Plant Facility ATTY. MARK C. TOLENTINO
♥ Note: Must have a satellite office/service center in Cebu (for supplier outside Cebu).                     BAC Chairman
♥ Please submit  Certified True Copy of Business/Mayor’s Permit.
Item Quantity Unit                             Articles and Description Brand Offer Unit cost Total Price
1 2 Units 2.0HP Aircon, Wall Mounted, Inverter Type
Specifications:
 * Cooling Capacity Rated (Max-Min) Btu/h: 23,150 ; 18,100
 * Voltage, Frequency, Phase: 220-230V, 60Hz.
 * Refrigerant: R410A
 * Airflow (m3h): 1,150/860/670
 * Dimension: Indoor – W-990xD-218 x H-315mm
                    Outdoor – W-760xD-285 x H-590mm
 * Weight: Indoor – Net/Gross: 12/15; Outdoor – Net/Gross: 34.5/37
 * Liquid Gas: 1/4″, 1/2″
 * Max. Refrigerated Pipe Length: 20m
 * Max. Difference on Level: 8
 * Operation Temp. Range: 17-30°C
 * Ambient Temp. Range: 0 – 50°C
 * Warranty: 5 Years on Compressor Motor, 1 Year  on Parts & Service.
INSTALLATION WORKS Include the ff:
 * Supply Copper Tubing w/ Insulation
 * System Processing
 * Winning Control, Owner to Supply wiring requirements from Main
   Circuit Breaker to Aircon Outdoor (ACCU) Unit
 * Circuit Breaker with Nema 3 Enclosure
 * Fabrication of Angilar Brackets
 * PVC Piping for Water Drain
PURPOSE: ***For use in Naga Farm Facility & New Office Extension -LN2 Plant Facility (PVO).***
Canvassed by ____________________
    Signature of bidder or his/her representative
                    over printed Name
PLEASE LABEL YOUR ENVELOPE. Sign your Quotation and State the brand of the Articles quoted.
TO DOWNLOAD THE FILE, PLEASE CLICK:
Copy of 19-03-1138